This MCP server provides specialized tools for mining engineers and financial analysts to evaluate concentrator capacity expansion. It allows for comparing different strategies like debottlenecking versus new line installation. Use `analyze_expansion_options` to determine physical and financial characteristics, `calculate_expansion_economics` to find net value and annualized return, `compare_expansion_strategies` to rank options by efficiency, and `validate_constraints` to ensure proposed expansions stay within physical site limits.

## Tools

### analyze_expansion_options
Compares different expansion strategies to determine their physical and financial characteristics

### calculate_expansion_economics
Determines the financial viability of a specific expansion option

### compare_expansion_strategies
Ranks different expansion options based on their net value

### validate_constraints
Ensures a proposed expansion is physically and logically compatible with the current facility state

## Prompt Examples

**Prompt:** 
```
Compare two expansion options: a debottlenecking option with 50 units added at 100 cost, and a new line with 200 units added at 500 cost. Revenue per unit is 10 and life is 5 years.
```

**Response:** 
```
The new line is the most efficient option with a net value of 500 and an efficiency ratio of 1.0, compared to the debottlenecking option which has a net value of 400.
```

**Prompt:** 
```
Is it feasible to add 500 units of capacity if the current capacity is 1000 and the max facility limit is 1200?
```

**Response:** 
```
No, the expansion is infeasible because the resulting total capacity of 1500 exceeds the maximum facility limit of 1200.
```

**Prompt:** 
```
Calculate the economics for an expansion with 100 incremental capacity, 50 CAPEX, 20 revenue per unit, and a 10 year life.
```

**Response:** 
```
The expansion has a total CAPEX of 50, total incremental revenue of 2000, a net value of 1950, and an annualized return of 195.
```

## Frequently Asked Questions

**How do I compare debottlenecking vs new line installation?**
You can use `analyze_expansion_options` to get the characteristics of both paths, then use `compare_expansion_strategies` to rank them based on net value.

**Can I check if an expansion is physically possible?**
Yes, use the `validate_constraints` tool to check if a proposed expansion exceeds the maximum facility limit.

**How is the economic return calculated?**
The `calculate_expansion_economics` tool calculates the net value by subtracting CAPEX from total incremental revenue, then provides the annualized return.