# Long-Term Mine Plan Engine AI Agent Connect

> Generates life-of-mine schedules and resource depletion profiles.

## Overview
- **Category:** engineering
- **Price:** Free
- **Endpoint:** https://edge.vinkius.com/vk_preview_J4muLQj5sNa5tMKlVSBpINZa6lXPobCe9Tj5MCxX/ai-agent-connect
- **Tags:** mining, resource-modeling, production-scheduling, geology, optimization

## Description

This MCP server provides specialized tools for mining engineering. It allows AI agents to validate resource integrity using `analyze_resource_reserves`, create extraction roadmaps with `generate_production_schedule`, track inventory via `calculate_depletion_profile`, and identify operational bottlenecks with `evaluate_capacity_constraints`.

## Tools

### calculate_depletion_profile
Tracks the remaining inventory of resources over the planned duration

### analyze_resource_reserves
Validates the integrity of the input data before planning begins

### evaluate_capacity_constraints
Identifies bottlenecks where the mine plan exceeds physical limits

### generate_production_schedule
Calculates the yearly movement of material based on constraints

## Prompt Examples

**Prompt:** 
```
Validate if my reserve statement is consistent with my resource model data.
```

**Response:** 
```
The resource validation is successful. The total ore tonnage is 5,000,000 and the reserve-to-resource ratio is 0.85.
```

**Prompt:** 
```
Generate a production schedule for a mine with 2,000,000 tons of ore and a 500,000 ton annual capacity.
```

**Response:** 
```
The production schedule is complete. The mine will operate for 4 years, extracting 500,000 tons of ore annually.
```

**Prompt:** 
```
Check for capacity bottlenecks in my current mine plan.
```

**Response:** 
```
No bottlenecks were detected. The planned ore and waste tonnage remain within the specified capacity limits for all years.
```

## Frequently Asked Questions

**How do I validate my resource and reserve data?**
You can use the `analyze_resource_reserves` tool to ensure your reserve statement is consistent with your resource model.

**Can I identify production bottlenecks?**
Yes, the `evaluate_capacity_constraints` tool identifies years where the plan exceeds processing or waste capacity limits.

**How is the life-of-mine schedule generated?**
The `generate_production_schedule` tool calculates yearly material movement based on your processing capacity and mining sequence.
