# Mine Site Drainage Design AI Agent Connect

> Hydrological engineering tools for designing mine site drainage, sizing infrastructure, and managing sediment risk.

## Overview
- **Category:** engineering
- **Price:** Free
- **Endpoint:** https://edge.vinkius.com/vk_preview_mKkR0w7MOKQs5fUyzlDxXqQ3Jmp8lh8axBRczKKG/ai-agent-connect
- **Tags:** drainage, runoff, sediment, infrastructure, mining-engineering

## Description

This MCP server provides a suite of hydrological engineering tools to design safe and efficient drainage systems for mining operations. It allows AI agents to calculate peak runoff using `calculate_peak_flow`, determine ditch dimensions with `size_drainage_ditch`, and size culverts via `size_culvert`. Additionally, it includes capabilities to `evaluate_sediment_risk` and `design_diversion_path` to protect critical site assets from water ingress and erosion.

## Tools

### calculate_peak_flow
Determines the maximum water volume expected during a design storm event

### design_diversion_path
Provides the necessary diversion requirements to protect specific site assets

### evaluate_sediment_risk
Assesses if the current drainage design provides sufficient sediment mitigation

### size_culvert
Determines the appropriate pipe or tunnel diameter for water crossing under infrastructure

### size_drainage_ditch
Calculates the required dimensions for open channels to safely contain peak water flow

## Prompt Examples

**Prompt:** 
```
Calculate the peak flow for a 50 hectare area with 25 mm/hr rainfall and a 0.4 runoff coefficient.
```

**Response:** 
```
The peak flow rate for the specified area is 50.0 m³/s.
```

**Prompt:** 
```
What are the dimensions for a ditch with a peak flow of 2.5 m³/s, a 2% slope, and 1.5 m/s allowable velocity?
```

**Response:** 
```
The required ditch dimensions are a width of 3.5 meters and a depth of 1.8 meters.
```

**Prompt:** 
```
Assess the sediment risk for a flow of 1.2 m³/s at a velocity of 0.8 m/s with a sediment load of 0.5 kg/m³.
```

**Response:** 
```
The sediment risk level is Low, with an effectiveness score of 0.85.
```

## Frequently Asked Questions

**How do I calculate the peak flow for a new catchment area?**
You can use the `calculate_peak_flow` tool by providing the rainfall intensity, the total catchment area in hectares, and the runoff coefficient.

**Can this tool help with erosion control?**
Yes, you can use `evaluate_sediment_risk` to assess if your channel velocity and sediment load require further mitigation to prevent erosion.

**How do I size a culvert for a haul road?**
Use the `size_culvert` tool with the peak flow rate, the culvert slope, and the maximum allowable headwater depth.