# Stockpile Management Model AI Agent Connect

> Optimize stockpile inventory, blending ratios, and draw strategies with real-time grade and capacity tracking.

## Overview
- **Category:** inventory-management
- **Price:** Free
- **Endpoint:** https://edge.vinkius.com/vk_preview_gQh7dB84KhEbGHdYevDdop46rGcbU81gmQ7OCMZD/ai-agent-connect
- **Tags:** stockpile, blending, inventory, optimization, industrial

## Description

The Stockpile Management Model connects AI agents to critical inventory and blending operations. It provides tools to monitor stockpile health, calculate precise blending ratios to meet target grades, and optimize extraction strategies. By accounting for physical factors like oxidation and segregation, it ensures consistent feed quality. Use `get_stockpile_status` to check current levels and grades, `calculate_blending_ratios` to plan material mixes, `optimize_draw_strategy` for extraction instructions, and `check_capacity_constraints` to prevent storage overflows.

## Tools

### calculate_blending_ratios
Determines how to mix different stockpiles to hit a specific target grade

### check_capacity_constraints
Validates if planned inventory additions or movements will exceed physical limits

### get_stockpile_status
Provides a real-time snapshot of current stockpile levels, grades, and physical health

### optimize_draw_strategy
Determines the best way to extract material from stockpiles to maintain grade consistency and manage inventory

## Prompt Examples

**Prompt:** 
```
What is the current status of stockpile ID 'STK-001'?
```

**Response:** 
```
Stockpile STK-001 has a current volume of 500m³, a grade of 65%, and a low segregation risk.
```

**Prompt:** 
```
How much of STK-001 and STK-002 do I need to get 100m³ at a grade of 70%?
```

**Response:** 
```
To achieve 100m³ at 70% grade, you need 40m³ from STK-001 and 60m³ from STK-002.
```

**Prompt:** 
```
Give me a draw strategy for a target grade of 68% and 50m³ volume using STK-001 and STK-003.
```

**Response:** 
```
The optimal draw strategy is to extract 30m³ from STK-001 and 20m³ from STK-003 to maintain feed stability.
```

## Frequently Asked Questions

**How does the model handle material degradation?**
The model accounts for oxidation by adjusting the current grade of a stockpile based on its exposure level, ensuring blending calculations remain accurate.

**Can I check if a stockpile is full before adding material?**
Yes, you can use the `check_capacity_constraints` tool to validate if proposed additions will exceed the physical limits of your stockpiles.

**How are blending ratios calculated?**
The `calculate_blending_ratios` tool calculates the exact proportions of available stockpiles needed to reach a specific target grade and volume.
