An astronaut overseeing a futuristic data hub

Connect Construction Schedule Calculator to your AI

Set it up once and it works in ChatGPT, Claude, Cursor, and any other client you love. It all runs safely in the background, so you can relax and focus on what really matters. Get accurate project timelines based on building type and area.

Ask AI about this Connector

Developed, maintained, and hosted by Vinkius.

MCP VERIFIED · PRODUCTION READY · VINKIUS GUARANTEED

Waiting for input…

Works with modern AI clients that support MCP, including ChatGPT, Claude, Cursor, and more.

ChatGPTClaudeCursorPerplexityGeminiMicrosoft CopilotRaycastMeta AI

Your AI does the work. We keep it safe and sound.

No other AI tool gives you this. Your workflow runs in the client you already love, your account stays protected, and you decide what the agent can and cannot do. It is the whole reason to make the switch.

Each Connector lives inside our infrastructure, the same place where your workflow runs. The three things below are already part of it, working quietly in the background so you never have to think about them. Nothing to add, nothing to set up, nothing to worry about.

A futuristic MCP client docking bay
V8 Isolate01

Each Connector runs inside its own sealed environment.

Each Connector runs inside its own sealed V8 runtime — no access to your files, your system, or other servers. A Connector never sees past its own request.

Kill Switch02

One switch stops every agent. Instantly.

One action deactivates every Connector, revokes every token, and ends every session at once. AI Governance keeps the record.

FinOps per User03

Spending limits that pause instead of surprise.

Every user keeps their own connections and credentials, isolated from everyone else. Anything that would cross your spending limit is held for your approval, not billed.

Three controls, built into the layer your AI connects through.

Curated set · 3 capabilities

We ship only the actions that matter.

Capability set01 / 01

01-03

3 capabilities in this set.

Part of 3 available through Construction Schedule Calculator.

  1. 01

    Get construction reference

    This capability provides the list of supported construction types. Use it to see if your project falls under Residential, Commercial, or Industrial categories.

  2. 02

    Get phase durations

    This capability calculates the estimated time required for every individual phase of a build. It breaks down the timeline into specific steps like site work, foundation, and finishes.

  3. 03

    Get schedule summary

    This capability generates a high-level overview of the entire project timeline. It provides the total duration in both weeks and months.

Real work

What teams actually run

01

Initial Project Planning

A manager provides the building area to get a rough estimate of the total project duration.

02

Detailed Phase Breakdown

An estimator requests a week-by-week breakdown of every construction stage for a specific site.

03

Complexity Verification

A user checks the supported construction types to ensure their project type is valid for calculation.

04

Timeline Reporting

An agent generates a summary of total weeks and months to present to a client.

Automate a task

Put Construction Schedule Calculator to work on one thing.

Step-by-step automations your AI runs through this Connector: the workflow, the prompts to start with, and the exact capabilities behind each move.

One connector, every AI

Construction Schedule Calculator works with the most popular AI clients.

These are the most popular clients, each with a step-by-step guide: one link, set up once, with governance and visibility built in. And because everything runs on the MCP standard, the same connection also works in any other compatible client — nothing to rebuild.

Building your own app? The connector is yours to use.

You don't need a client to put Construction Schedule Calculator to work: the same hosted connection plugs into your own applications and agent code, with the same governance on every request. Build with it, chat with it — one connection for both.

Observed, not estimated

742ms average. Fast in production.

Construction Schedule Calculator is checked daily against the live service.

Daily averagePeak 987ms
Oct 3Today
Fastest day
531ms
Slowest day
987ms
14-day trend
Improving-18%

Connect your client

One URL. Every client.

Activate the Connector, copy your link, and paste it into the client you already use. 3 capabilities arrive ready to run.

Preview access · not provider authentication

The vk_preview_* token belongs to Vinkius preview infrastructure. It lets Claude discover and display the capabilities of Construction Schedule Calculator, so you can see the experience inside your AI.

It does not authenticate your account with Construction Schedule Calculator. Actions requiring credentials or live account data may not run until you activate the Connector and authorize the service.

Construction Schedule Calculator Connector

You're all set. Choose your MCP client and follow the setup instructions.

Connector linkhttps://edge.vinkius.com/vk_preview_hSzuteKxydreUQ8Y8wAhvdGuvLyToRcB5YDkNLg9/mcp

Claude Desktop

Follow the steps below to connect in seconds.

  1. 1In Claude Desktop, open Settings → Connectors.
  2. 2Click “Add custom connector” and paste the connector link above as the remote MCP server URL.
  3. 3Click Add and start a new chat — Construction Schedule Calculator capabilities are ready to use.
Configuration · claude_desktop_config.jsonCopy
{
  "mcpServers": {
    "construction-schedule-calculator-mcp": {
      "url": "https://edge.vinkius.com/vk_preview_hSzuteKxydreUQ8Y8wAhvdGuvLyToRcB5YDkNLg9/mcp"
    }
  }
}
  • Claude
  • ChatGPT
  • Cursor
  • VS Code
  • Windsurf
  • Claude Code
  • JetBrains
  • Cline

Step-by-step instructions for each client are in the guide. How to connect

Guided setup for Claude? Set up Construction Schedule Calculator in Claude and other AIs

See all the AI clients this connector works with ↑

Who it's for

Built for the work Construction Schedule Calculator owners hand off.

This MCP is built for professionals who need to turn building specs into schedules quickly.

  • 01

    Project Managers

    They use the AI to generate initial timeline drafts for stakeholder meetings.

  • 02

    Construction Estimators

    They feed area and type data to the agent to get phase-specific durations.

  • 03

    Developers

    They use the summary capability to get a high-level view of project completion dates.

FAQ

Questions Construction Schedule Calculator owners ask.

  • 01

    What construction types can I estimate?

    The MCP supports Residential, Commercial, and Industrial construction types.

  • 02

    How does the capability provide the timeline?

    It calculates durations for individual phases and can also provide a total summary in weeks and months.

  • 03

    Can I get a breakdown of every phase?

    Yes, the get_phase_durations capability provides the estimated weeks for each specific stage of the build.

  • 04

    Which AI clients can use this MCP?

    You can use this with any MCP-compatible client like Claude, Cursor, or Windsurf.

  • 05

    Does it work for large industrial projects?

    Yes, it handles various scales, including large industrial projects, and provides a summary of the total duration.

  • 06

    How do I calculate the duration for specific phases?

    Use the get_phase_durations capability by providing your construction type and the total project area.

  • 07

    What construction types are supported?

    The server supports Residential, Commercial, and Industrial construction types. You can check all details using get_construction_reference.

  • 08

    Can I get a total project timeline summary?

    Yes, use the get_schedule_summary capability to retrieve the total estimated weeks and months for your project.

Connect Construction Schedule Calculator to Claude, Cursor, ChatGPT & more