ClaudeChatGPTPerplexityGeminiMicrosoft CopilotRaycastMeta AIGrokZ.aiQwenKimi
DeepSeekMistralCursorVS CodeWindsurfJetBrainsClineLovableVercel AI SDKLangChain

Use Cooling Tower Sizing with your AI.

Connect your account once and let the AI you already use work with it, without building another integration. Get precise thermodynamic sizing and water balance data.

Included with plan

Ask AI about this Connector

Developed, maintained, and hosted by Vinkius.

MCP VERIFIED · PRODUCTION READY · VINKIUS GUARANTEED

Waiting for input…

Works with modern AI clients that support MCP, including ChatGPT, Claude, Cursor, and more.

ChatGPTClaudeCursorPerplexityGeminiMicrosoft CopilotRaycastMeta AI

Complete set · 4 capabilities

The complete Cooling Tower Sizing capability set.

These are the exact actions your AI can choose when you ask it to work with Cooling Tower Sizing.

Capability set01 / 01

01-04

4 capabilities in this set.

Part of 4 available through Cooling Tower Sizing.

  1. 01

    Estimate water balance

    This capability calculates the water balance for your cooling tower system. It determines necessary makeup water and total system losses.

  2. 02

    Calculate tower dimensions

    This capability determines the physical size and air flow requirements for a tower. It uses heat load and wet bulb temperature to find the right dimensions.

  3. 03

    Validate cooling constraints

    This capability checks if a specific temperature profile is physically possible. It ensures your cooling targets meet hardware and environmental constraints.

  4. 04

    Get tower efficiency metrics

    This capability provides thermal effectiveness data. It calculates specific efficiency metrics for your cooling tower design.

One connector, every AI

Cooling Tower Sizing works with the most popular AI clients.

These are the most popular clients, each with a step-by-step guide: one link, set up once, with governance and visibility built in. And because everything runs on the MCP standard, the same connection also works in any other compatible client — nothing to rebuild.

Building your own app? The connector is yours to use.

You don't need a client to put Cooling Tower Sizing to work: the same hosted connection plugs into your own applications and agent code, with the same governance on every request. Build with it, chat with it — one connection for both.

Observed, not estimated

766ms average. Fast in production.

Cooling Tower Sizing is checked daily against the live service.

Daily averagePeak 1003ms
Sep 11Today
Fastest day
760ms
Slowest day
1003ms
14-day trend
Improving-24%

Connect your client

One URL. Every client.

Activate the Connector, copy your link, and paste it into the client you already use. 4 capabilities arrive ready to run.

Preview access · not provider authentication

The vk_preview_* token belongs to Vinkius preview infrastructure. It lets Claude discover and display the capabilities of Cooling Tower Sizing, so you can see the experience inside your AI.

It does not authenticate your account with Cooling Tower Sizing. Actions requiring credentials or live account data may not run until you activate the Connector and authorize the service.

Cooling Tower Sizing Connector

You're all set. Choose your MCP client and follow the setup instructions.

Connector linkhttps://edge.vinkius.com/vk_preview_PmiLMfMyzJ67u0c1Punn3cdkMEkdVK2A5k00UWFv/mcp

Claude Desktop

Follow the steps below to connect in seconds.

  1. 1In Claude Desktop, open Settings → Connectors.
  2. 2Click “Add custom connector” and paste the connector link above as the remote MCP server URL.
  3. 3Click Add and start a new chat — Cooling Tower Sizing capabilities are ready to use.
Configuration · claude_desktop_config.jsonCopy
{
  "mcpServers": {
    "cooling-tower-sizing-utility-mcp": {
      "url": "https://edge.vinkius.com/vk_preview_PmiLMfMyzJ67u0c1Punn3cdkMEkdVK2A5k00UWFv/mcp"
    }
  }
}
  • Claude
  • ChatGPT
  • Cursor
  • VS Code
  • Windsurf
  • Claude Code
  • JetBrains
  • Cline

Step-by-step instructions for each client are in the guide. How to connect

Guided setup for Claude? link.label

See all the AI clients this connector works with ↑

Who it's for

Built for the work Cooling Tower Sizing owners hand off.

This MCP is built for engineers working on industrial thermal systems and water treatment.

  • 01

    Thermal Engineers

    They hand off heat load and wet bulb data to get tower dimensions.

  • 02

    Mechanical Designers

    They use the capability to verify if cooling profiles fit hardware constraints.

  • 03

    Water Treatment Specialists

    They use the water balance capabilities to plan makeup water requirements.

FAQ

Questions Cooling Tower Sizing owners ask.

  • 01

    What can this MCP calculate for cooling towers?

    It calculates physical dimensions, air flow requirements, water balance, and thermal efficiency metrics.

  • 02

    How does it handle water balance?

    The MCP uses evaporation and blowdown rates to estimate the total makeup water and system losses.

  • 03

    Can I check if my cooling design is physically possible?

    Yes, you can use the validation capability to see if your temperature profile meets hardware and environmental constraints.

  • 04

    Which AI clients can use this MCP?

    You can use this with any MCP-compatible client like Claude, Cursor, or Windsurf.

  • 05

    Do I need to host the MCP myself?

    No, Vinkius hosts and manages the MCP so it is ready to use as soon as you connect.

  • 06

    How do I determine the physical size of my tower?

    You can use the calculate_tower_dimensions capability by providing the heat load, wet bulb temperature, approach temperature, and circulation rate.

  • 07

    Can I check if my cooling target is realistic?

    Yes, the validate_cooling_constraints capability allows you to verify if a target water temperature is feasible given the ambient wet bulb temperature and hardware limits.

  • 08

    How much makeup water will I need?

    Use the estimate_water_balance capability with your evaporation and blowdown rates to find the total required makeup water.