- TIMELINE
- STATUS
- LOGIC
- REVIEW
Short answer
When do my duties resume after a disruption?
Your AI calculates the exact date or milestone for resumption by processing the disruption event against your contract. You'll get a clear timeline of when obligations restart.
The results you get.
Where your data lands.
The AI processes the disruption and delivers these specific outcomes.
TIMELINE
Resumption dates
The AI identifies the specific date when the suspension period ends and duties resume.
STATUS
Current obligation state
You see which specific clauses are currently suspended and which remain active.
LOGIC
Calculation breakdown
The AI provides the specific math used to determine the suspension length.
REVIEW
Human verification
You get a summary to check before you act on any legal or operational decisions.
The workflow
What your AI does when the disruption arrives.
The AI handles the heavy lifting of calculating the suspension window.
Analyze the event
Your AI reads the details of the force majeure event and the relevant contract terms.
calculate_suspension_periodCalculate suspension
The AI determines the length of the interruption period using the specific tool.
calculate_suspension_periodIdentify resumption
The AI maps the end of the suspension to the specific resumption of duties.
calculate_suspension_periodSummarize findings
The AI presents the final dates and the logic used to reach them.
calculate_suspension_period
Try it
Copy these to start.
Paste these into your chat to begin.
Starting points
These are opening lines. Swap the bracketed text for your actual contract or event details.
Force Majeure Calculator Connector
You're all set. Choose your MCP client and follow the setup instructions.
https://edge.vinkius.com/vk_preview_WW95tHRZGqTa6VXLC5WtRM9P4QEm3Vhl3RxgPlQV/mcpClaude Desktop
Follow the steps below to connect in seconds.
- 1In Claude Desktop, open Settings → Connectors.
- 2Click “Add custom connector” and paste the connector link above as the remote MCP server URL.
- 3Click Add and start a new chat — Force Majeure Calculator capabilities are ready to use.
{
"mcpServers": {
"force-majeure-impact-calculator-mcp": {
"url": "https://edge.vinkius.com/vk_preview_WW95tHRZGqTa6VXLC5WtRM9P4QEm3Vhl3RxgPlQV/mcp"
}
}
}Calculate the resumption date for the supply contract in my Google Drive after the recent flood.
Based on the force majeure clause in the attached PDF, when does the delivery obligation resume?
Run a suspension period calculation for the logistics agreement following the port strike.
How long is the suspension period for the service agreement listed in my Notion workspace?
Claude
ChatGPT
Cursor
VS Code
Windsurf
Claude Code
JetBrains
Cline
Start here
Connect Force Majeure Impact Calculator once, then ask.
Connect the MCP to your client in one click. Your login stays encrypted on our side and the full walkthrough is on the Connector page.
Connect Force Majeure Impact Calculator to your AIFAQ
How this task behaves
- 01
Can the AI change the contract terms?
No. The AI only reads the terms to perform the calculation.
- 02
Does the AI decide if an event is force majeure?
No. You must provide the event details; the AI only calculates the resulting period.
- 03
Can the AI send a notice to the other party?
No. The AI only provides the calculation and the dates.
- 04
What happens if the contract doesn't have a force majeure clause?
The AI cannot calculate a suspension period if the necessary clause is missing from the data you provide.
- 05
Can I use this with Cursor or Claude?
Yes, it works with any MCP-compatible client.
More questions about Force Majeure Impact Calculator? The Connector page answers them. See everything the Force Majeure Impact Calculator Connector can do
Connect Force Majeure Calculator to Claude, Cursor, ChatGPT & more
