Short answer
How can I see how new scope affects my turnaround date?
Your agent uses the connector to pull your current schedule and run simulations based on new inspection data or added tasks. You'll get a clear view of how these changes push your end date or hit your float. This breakdown shows you exactly how the math works.
The outcomes.
Where your analysis lands.
Your agent processes your schedule data to produce these specific outcomes.
TIMELINE
Updated completion dates
Your agent calculates the new project end date based on the expanded scope. You get a direct comparison between your original plan and the new reality.
RISK
Critical path shifts
Your agent identifies if the new work has become the new bottleneck. You'll see which specific tasks are now driving the entire turnaround.
RESOURCES
Labor and equipment impact
The simulation shows how much extra time or manpower is needed to absorb the new scope. This helps you decide if you need to add shifts.
HUMAN
Decision support
Your agent provides the data, but you decide whether to approve the extra cost or find ways to compress the schedule. You remain in control of the final plan.
The workflow
What your agent does when the scope changes.
Your agent handles the heavy lifting of recalculating the schedule logic so you don't have to manually trace dependencies.
Identify the bottleneck
Your agent looks at your current schedule to find the sequence of tasks that dictates the finish date.
get_critical_pathModel the new work
You provide the details of the new inspection findings or extra repairs found during the outage.
simulate_scope_expansionCalculate the delay
Your agent runs the simulation to see how the new tasks interact with existing dependencies.
simulate_scope_expansionReport the impact
Your agent summarizes how much the end date has moved and which tasks are now critical.
get_critical_path
Vinkius Agentic Execution Platform
State the outcome. Agents take it from there.
You don't have to drive this run by hand. Inside the Vinkius Agentic Execution Platform, agents pick up the task above and carry it to the end: you set the limits, you watch the steps, you keep all decisions.
Run it in Vinkius
Agents carry the task to the end
Agents execute Refinery Turnaround Planner tasks from end to end inside the Vinkius Agentic Execution Platform: set the outcome, and the steps run.
Take it to any compatible AI
One connection, any client
Same connection follows you to ChatGPT, Claude, Gemini and any other client you love. Switch whenever you want: your connection, your permissions and your record move with you.
Spaces
One Space per activity
A Space gathers the context, tools and tasks of one activity, so you coordinate several agents at once and follow each execution as it happens.
Limits
Autonomy inside limits you set
Permissions and spending limits are yours to define. Agents halt for your approval on anything sensitive, and you choose how far autonomy goes, step by step or end to end.
Record
All steps, on the record
Each action your agents take lands in a signed audit trail. Results are verified, mistakes are learned from, and an emergency stop is one click away.
Models
Included in your plan
A curated selection of AI models is included in your plan, and you can add your own through BYOK whenever you prefer.
Try it
Copy these to start.
Use these prompts to kick off your analysis.
Starting points
Swap out the bracketed text with your actual project names or specific inspection IDs.
Refinery Turnaround Planner Connector
You're all set. Choose your MCP client and follow the setup instructions.
https://edge.vinkius.com/vk_preview_tgXz2hRwLW2vrlKPdOGAEwopLAP5wjMeRbQhPjZf/mcpClaude Desktop
Follow the steps below to connect in seconds.
- 1In Claude Desktop, open Settings → Connectors.
- 2Click “Add custom connector” and paste the connector link above as the remote MCP server URL.
- 3Click Add and start a new chat, Refinery Turnaround Planner capabilities are ready to use.
{
"mcpServers": {
"refinery-turnaround-planner-mcp": {
"url": "https://edge.vinkius.com/vk_preview_tgXz2hRwLW2vrlKPdOGAEwopLAP5wjMeRbQhPjZf/mcp"
}
}
}- 01
Get the current critical path for the Unit 4 turnaround.
- 02
Simulate adding 48 hours of unexpected piping repair to the current scope.
- 03
How does the new inspection finding in the heat exchanger affect our completion date?
- 04
Run a scope expansion simulation for the cooling tower repairs found yesterday.
Claude
ChatGPT
Cursor
VS Code
Windsurf
Claude Code
JetBrains
Cline
Start here
Connect Refinery Turnaround Planner once, then ask.
Link the connector to your preferred AI client. Your credentials stay encrypted, and you can start asking questions immediately.
Connect Refinery Turnaround Planner to your agentFAQ
How this task behaves.
- 01
Can your agent change my actual schedule file?
No. Your agent only reads your data and runs simulations. It cannot write changes back to your primary scheduling software.
- 02
Does your agent automatically add new tasks to my project?
No. Your agent only simulates the impact of new tasks within its own logic to show you what might happen.
- 03
What data does your agent need to run a simulation?
It needs your current schedule data and the specific details of the new scope or inspection findings you want to test.
- 04
Can I use this with Claude or Cursor?
Yes, as long as you are using an MCP-compatible client, you can use this connector.
- 05
How does it know which tasks are critical?
It uses the get_critical_path tool to identify the longest sequence of dependent tasks in your current plan.
More questions about Refinery Turnaround Planner? The Connector page answers them. See everything the Refinery Turnaround Planner Connector can do
Building with AI? Ship this whole workflow in your product.
Vinkius Connect is the connectivity layer for AI builders. All the capabilities used on this page, from Refinery Turnaround Planner to thousands more, arrive through one SDK, already maintained for you. One Application, unlimited seats, each with their own connectors and credentials, isolated and never exposed to Vinkius. No OAuth flows to write, no tokens to store, no APIs to chase.
Explore Vinkius ConnectTypeScript · Python · Java · Go · C# · PHP · Rust
- 01
Your customers bring their own keys.
Each user connects their own apps and keeps their own credentials. Vinkius only sees the identifier your backend sends.
- 02
Whole catalog, kept current.
Refinery Turnaround Planner plus thousands more, maintained and growing daily. No integrations to write, no token storage, no OAuth plumbing.
- 03
Any agent, any model.
Capabilities land as framework-neutral objects, with adapters for OpenAI, Anthropic, Gemini, the Vercel AI SDK, LangChain and more.
Connect Refinery Turnaround Planner to Claude, Cursor, ChatGPT & more
From idea to done
See what gets done when the agents take over the busywork
Each workflow on this page runs on the same platform. Connect your tools once, and your agents keep working in any AI you trust.