- LEVELLED
- STABLE
- VISUAL
- HUMAN
Our technology reaches across leading technology and enterprise teams.

Short answer
How do I stop my team from being overbooked?
Your agent identifies tasks with enough float to move without delaying the project. It shifts these tasks to fill gaps in your schedule and flatten out resource spikes. You get a balanced plan that respects your capacity limits.
The results.
Where your schedule lands.
Your agent processes your raw task list into these specific outcomes.
LEVELLED
Balanced task distribution
Your agent moves tasks into available time slots. You get a schedule where no single person is slammed while others are idle.
STABLE
Protected project dates
By using available float, your agent ensures that shifting tasks doesn't push back your final deadline.
VISUAL
Clear capacity views
Your agent identifies exactly where your bottlenecks were and how the new distribution looks compared to the old one.
HUMAN
Final logic check
Your agent presents the proposed shifts to you. You decide if the new timing works for your team's actual availability.
The workflow
What your agent does when the data arrives.
Your agent performs the heavy lifting of calculating slack and reassigning work.
Identify slack
Your agent looks at each task to see how much wiggle room exists before a delay hits the critical path.
simulate_float_impactFlatten the spikes
Your agent moves tasks from over-allocated periods into those identified slack periods.
calculate_leveled_scheduleValidate the new plan
Your agent runs the new schedule against your original constraints to ensure no new bottlenecks were created.
simulate_float_impactPresent options
Your agent provides a summary of the changes made to your resource loading.
calculate_leveled_schedule
Vinkius Agentic Execution Platform
State the outcome. Agents take it from there.
You don't have to drive this run by hand. Inside the Vinkius Agentic Execution Platform, agents pick up the task above and carry it to the end: you set the limits, you watch the steps, you keep all decisions.
Run it in Vinkius
Agents carry the task to the end
Agents execute Resource Leveling Scheduler tasks from end to end inside the Vinkius Agentic Execution Platform: set the outcome, and the steps run.
Take it to any compatible AI
One connection, any client
Same connection follows you to ChatGPT, Claude, Gemini and any other client you love. Switch whenever you want: your connection, your permissions and your record move with you.
Spaces
One Space per activity
A Space gathers the context, tools and tasks of one activity, so you coordinate several agents at once and follow each execution as it happens.
Limits
Autonomy inside limits you set
Permissions and spending limits are yours to define. Agents halt for your approval on anything sensitive, and you choose how far autonomy goes, step by step or end to end.
Record
All steps, on the record
Each action your agents take lands in a signed audit trail. Results are verified, mistakes are learned from, and an emergency stop is one click away.
Models
Included in your plan
A curated selection of AI models is included in your plan, and you can add your own through BYOK whenever you prefer.
Try it
Copy these to start.
Use these prompts to trigger the leveling process.
Starting points
These are opening lines. Swap out the bracketed text for your specific project or sheet names.
Resource Leveling Scheduler Connector
You're all set. Choose your MCP client and follow the setup instructions.
https://edge.vinkius.com/vk_preview_SLPgJ39L2BZJIU0t0puOCdhV3XakJeMpeEDCdogT/mcpClaude Desktop
Follow the steps below to connect in seconds.
- 1In Claude Desktop, open Settings → Connectors.
- 2Click “Add custom connector” and paste the connector link above as the remote MCP server URL.
- 3Click Add and start a new chat, Resource Leveling Scheduler capabilities are ready to use.
{
"mcpServers": {
"resource-leveling-scheduler-mcp": {
"url": "https://edge.vinkius.com/vk_preview_SLPgJ39L2BZJIU0t0puOCdhV3XakJeMpeEDCdogT/mcp"
}
}
}- 01
Look at my Project Alpha sheet and find where my engineers are overbooked.
- 02
Calculate a leveled schedule for the tasks in the Marketing Campaign folder.
- 03
Simulate the impact on my float if I move the design tasks from Tuesday to Thursday.
- 04
Redistribute the workload for the Q3 Roadmap so no one exceeds 40 hours a week.
Claude
ChatGPT
Cursor
VS Code
Windsurf
Claude Code
JetBrains
Cline
Start here
Connect Resource Leveling Scheduler once, then ask.
Link your scheduling tool to Vinkius. Your credentials stay encrypted and private. Once connected, you can start asking your agent to fix your schedule immediately.
Connect Resource Leveling Scheduler to your agentFAQ
How the scheduler behaves
- 01
Will your agent change my original task dates?
No. Your agent only moves tasks within their existing float to avoid delaying the project.
- 02
Can your agent assign new people to tasks?
No. Your agent only redistributes the timing of existing tasks among the resources you have already assigned.
- 03
Does it work with my existing project management tool?
Yes, once you connect the MCP, your agent can read the data from your connected project sheets or task lists.
- 04
How does it know which tasks are safe to move?
It uses the float impact tool to check how much wiggle room each task has before it affects the project end date.
- 05
Does your agent make the final decision on the schedule?
No. Your agent proposes the leveled schedule, but you must review and approve the changes.
More questions about Resource Leveling Scheduler? The Connector page answers them. See everything the Resource Leveling Scheduler Connector can do
Building with AI? Ship this whole workflow in your product.
Vinkius Connect is the connectivity layer for AI builders. All the capabilities used on this page, from Resource Leveling Scheduler to thousands more, arrive through one SDK, already maintained for you. One Application, unlimited seats, each with their own connectors and credentials, isolated and never exposed to Vinkius. No OAuth flows to write, no tokens to store, no APIs to chase.
Explore Vinkius ConnectTypeScript · Python · Java · Go · C# · PHP · Rust
- 01
Your customers bring their own keys.
Each user connects their own apps and keeps their own credentials. Vinkius only sees the identifier your backend sends.
- 02
Whole catalog, kept current.
Resource Leveling Scheduler plus thousands more, maintained and growing daily. No integrations to write, no token storage, no OAuth plumbing.
- 03
Any agent, any model.
Capabilities land as framework-neutral objects, with adapters for OpenAI, Anthropic, Gemini, the Vercel AI SDK, LangChain and more.
Connect Resource Leveling Scheduler to Claude, Cursor, ChatGPT & more
From idea to done
See what gets done when the agents take over the busywork
Each workflow on this page runs on the same platform. Connect your tools once, and your agents keep working in any AI you trust.









